Technical reports

The HIRLAM Technical reports since the beginning of the HIRLAM programme are gradually being imported into the DOCman document management system.

 

Overview

TR# Subject Author(s)
HIRLAM Technical Report No. 70 (6.03 MB)icon

HARMONIE verifcation and evaluation
                March 2017 

Wim de Rooy and Hylke de Vries et al
HIRLAM Technical Report No. 69 (3.55 MB)icon A verification score for High resolution NWP:
idealized and preoperational tests
             December 2012

Bent H. Sass and Xiaohua Yang

... Report from the SRNWP Workshop on High
resolution data assimilation with emphasis
on the use of moisture-related observations
                July 2008

8

10 9

8

10 9

8

 

 

Categories

HIRLAM Technical Report No. 68, July 2008

HIRLAM Technical Report No. 68, July 2008 ( 10 Files )

Report from the SRNWP Workshop on High resolution data assimilation with emphasis on the use of moisture-related observations, held 21-23 March 2007 at the Museum of Work, Norrkøping, Sweden. Edited by Nils Gustafsson.

Documents

Order by : Name | Date | Hits [ Ascendant ]

HIRLAM Technical Report No. 49 HIRLAM Technical Report No. 49

hot!
Date added: 04/07/2009
Date modified: 04/07/2009
Filesize: 1.63 MB
Downloads: 4961
Nonhydrostatic adiabatic kernel for HIRLAM Part II: Anelastic, hybrid-coordinate explicit-Eulerian model, Aarne Männik and Rein Rõõm.

HIRLAM Technical Report No. 48 HIRLAM Technical Report No. 48

hot!
Date added: 04/07/2009
Date modified: 04/07/2009
Filesize: 225.68 kB
Downloads: 5096
Nonhydrostatic adiabatic  kernel for HIRLAM Part 1: FUndamentals of nonhydrostatic dynamics in pressure-related coordinates, Rein Rõõm

HIRLAM Technical Report No. 58 HIRLAM Technical Report No. 58

hot!
Date added: 04/07/2009
Date modified: 04/07/2009
Filesize: 1.02 MB
Downloads: 6002
Analysis of surface variables and parameterization of surface processes in HIRLAM. Part I: Approach and verification by parallel runs, E. Rodriguez, B. Navascues, J.J. Ayuso and S. Jarvenoja
(Manuscript received 23 September 2002, in nal form 17 January 2003.)

HIRLAM Technical Report No. 42 HIRLAM Technical Report No. 42

hot!
Date added: 04/07/2009
Date modified: 04/07/2009
Filesize: 1.49 MB
Downloads: 4821
Digital Filter Initialization for HIRLAM, Peter Lynch, Ray McGrath and Aidan McDonald, June 1999